Tip of the Week: Use Time Management to Spot Testing Bottlenecks

Estimated test duration vs. actual runtime tells you something important: which tests are slowing your team down. When actuals consistently exceed estimates, you’ve found a bottleneck: either the test is flawed, the feature is complex, or something else needs fixing.

The scenario:
Your regression cycle estimates 8 hours but consistently runs 12+. You don’t know why. Is one test taking forever? Are all tests slightly slow? Is the feature hard to test? Time Management gives you the data to answer these questions.

How it works:

  1. Enable Time Management: Project Admins must enable this first in Project Settings > General Settings by checking the “Time Management” box.
  2. Set estimates in the Test Library: When you create a test, enter an estimated duration (e.g., 10 minutes for a login test, 25 minutes for an end-to-end checkout flow) - you will see estimated duration as a system field.
  3. Run tests and track actuals: As testers run tests, PractiTest tracks actual runtime. They can pause, resume, and edit durations as needed. The results are populated in “Actual duration” field.
  4. Compare and identify gaps: View duration data at two levels:
    • Test level: See how long individual tests actually take vs. estimate
    • Test Set level: See accumulated estimated and actual duration for the entire set

Generate a report and look for tests or test sets where actual runtime significantly exceeds estimates. Those are your bottlenecks.

What you learn:

  • Individual test issues: “Login test estimates 5 min but runs 15 min” suggests the test steps are unclear, the feature is flaky, or the environment is slow.
  • Cycle planning: “Regression estimated at 8 hours, actual averages 12 hours” helps you plan sprints more realistically.
  • Test Set health: View the total estimated vs. actual duration for a complete regression or feature cycle at a glance.

What to do with the data:

  • Simplify tests that take longer than expected (break into smaller tests, remove redundant steps)
  • Update estimates based on actuals so future planning is accurate
  • Investigate environmental or tool issues if slow tests fail more often
  • Share data with dev teams: if testing takes longer because features are complex, that’s a signal for design review

How do you currently estimate test duration? Do you adjust estimates based on actual runs, or is it a one-time guess?